Not every job is a Good, Better, Best choice. A lot of commercial work is one quote with one set of lines. For that, set the estimate to One scope: no options, just the work and the price. On any estimate you can also split the lines into named sections, such as Controls, Valves and Labor, each with its own subtotal.

Who can do this

  • Sections: anyone who builds estimates in the office.
  • One scope: the choice is in the gear (Estimate settings). The gear only shows for people who are allowed to change company settings. If you do not see it, ask your owner to set the layout.

Options or One scope

LayoutWhat it is
OptionsThe customer chooses between options, like Good, Better and Best. This is how every estimate worked before, and it is still the starting point unless you change it.
One scopeOne quote with one set of lines and no Good, Better, Best.

On a one-scope estimate:

  • The builder has no Tiers strip and no option name to fill in. You go straight to the lines.
  • The PDF prints the lines on the first page, right under the header. There are no option cards and no option name.
  • Your estimate page in the office shows the lines without the row of option cards.
  • The customer's page still shows the work in one card, with the price and the approve button. See Limits to know about.

Set how new estimates start

  1. Go to Estimates and click the gear (Estimate settings).
  2. Open Basics.
  3. Under Layout, pick Options or One scope.
<!-- shot: Estimate settings, Basics, Layout set to One scope -->

From the Estimates list, this only sets how new estimates start. Estimates you already made stay as they are.

Switch the estimate you are working on

The same gear is now on the new estimate and edit estimate pages, at the top right. Open it there, go to Basics and change Layout. From this page it does two things at once:

  • The estimate on screen switches to the layout you picked.
  • New estimates start that way from now on.

On this page, Layout shows the layout of the estimate you have open, which can be different from how new estimates start.

<!-- shot: New estimate page with the gear at the top right and Layout open on One scope -->

Going from Options to One scope

The option you have open is kept as the scope. If other options have lines on them, a Switch to one scope? box asks first and names the options that will come off the estimate.

  • Switch to one scope keeps the open option and removes the others when you save.
  • Keep options changes nothing. The estimate stays as it was, and so does the way new estimates start.

Changed your mind before saving? Set Layout back to Options and the other options come back as they were. Once you save and leave the page, they are gone.

<!-- shot: Switch to one scope? box with Keep options and Switch to one scope -->

Going from One scope to Options

The lines you have stay on the first option, and two empty options are added beside it, the same three a new estimate starts with.

Good to know

  • More than one option always means Options. An estimate that has two or more options opens as an options estimate, whatever it was set to, so nothing on it is hidden.
  • A copy keeps its layout. A duplicated estimate starts on the same layout as the one you copied.
  • Build options and Apply template are part of the Tiers row. A one-scope estimate has no Tiers row, so those two buttons are not there. Add item and Apply bundle work as usual.

Split the lines into sections

Sections work on both layouts. On an options estimate, each option has its own sections.

  1. In the builder, click Add section.
  2. Type a name for the section, for example Controls, and press Enter.
  3. Click Add item inside that section to add lines straight into it.
  4. Repeat for each section you need.
<!-- shot: Estimate builder with three sections (Controls, Valves, Labor), each with its own table and subtotal -->

Each section is its own table with its own subtotal. The estimate total at the bottom does not change: it is still every line added together.

  • Move a line to another section. On a computer, drag the line from one section's table and drop it in another. You can also drag to change the order inside a section.
  • Rename a section with the pencil next to its name. Two sections on the same option cannot share a name.
  • Remove a section with the remove button on its heading. Only the heading goes. Its lines stay on the estimate.
  • Lines that are in no section sit at the top of the builder under Not in a section.
  • Add-ons are not part of any section. They stay in their own list.

Where sections show

PlaceWhat you see
The builderOne table per section, with its subtotal.
The PDFEach section's name as a heading, its lines, then a Section subtotal row.
The customer's pageThe section names and a Section subtotal in the price breakdown.
Your estimate pageThe same headings and Section subtotal rows.

On the PDF, the customer's page and your estimate page, lines that are in no section go under the heading Other items.

Section headings need the lines to be visible. On the PDF they print for an option priced as Itemized. An option sold at one price hides its lines, so it has no section headings either. See Choose how the price is shown.

What the job is called after approval

When an estimate becomes a job, the job needs a line that says what the work is. A one-scope estimate has no option name on screen, so Run a Call picks the best name it has, in this order:

  1. The option's own name, if it has one. This happens when the estimate started as an options estimate and you switched it to one scope: the option keeps the name it had.
  2. The Title you typed at the top of the estimate (its first line).
  3. If there is neither, the job reads Work from approved estimate.

So for one-scope work, fill in the Title box. It is what your dispatcher and tech will read on the job.

Limits to know about

  • The phone has no one-scope or section controls. The estimate builder in the tech app cannot switch an estimate to one scope and cannot add, rename or move sections. Sections the office made are kept when a tech edits and saves the estimate on a phone.
  • A second option added on a phone turns it into an options estimate. One scope holds one set of lines.
  • Jobs and invoices do not carry the section headings. When an estimate becomes a job, and when that job is invoiced, all the lines come across. The section names and section subtotals do not.
  • The customer's page still shows one card for one scope. The customer does not choose between options, but the work is still shown in a single card.